LV Testing Inspection Procedure
1. DO SOMETHING AT A TIME OF WORK
GO ARROUND TO YOUR SECTION ASSEMBLY FOR VISUAL CHECK,AND OBSERVE DURING ASSY FOR ANY CORRECTIVE ACTION TAKEN.
2. RECEIVE IN-PROCESS INSPECTION / TESTING REQUEST AT A TIME OF SUBMITTED BY PRODUCTION IN DOCUMENT CONTROL.
3. REVIEW ALL THE RELEASED DRAWING , DISCARD THE OLD DRAWINGS
ON THE FILE RECORD AND UPDATE IT FOR FINAL INSPECTION USE.
4. CHECKING THE PANELS – USE THE UPDATE DRAWING FOR PROCESS- INSPECTION. ALL DWGS SHOULD BE WITH MARK-UP WITH CORRECTION, AND ANY DIFFERENT ON ACTUAL ASSEMBLY DURING INSPECTION.
5. DO THE REQUIRED INSPECTION PROCEDURE AND TESTING AS FOLLOW.
A. PROVIDE PUNCHLIST REPORTS IF ANY MISTAKE OR DISCREPANCY.
B. APPLIED MEGGER TEST AND RECORD ON TEST SHEET.
C. APPLIED DIE ELECTRIC – HI -POT TEST AND RECORD ON TEST SHEET.
D. DO THE FUNT’L TESTING AS PER RELEASED APPROVED DWG ETC.
E. RETURN BACK THE PUNCHLIST TO THE DOCUMENTS CONTROL FOR
CORRECTION BY THE PRODUCTION ASSEMBLY.
6. RE-CHECK THE CORRECTIVE ACTION OF THE COMMENTS and UP-DATE THE PUNCH LIST AND CLOSE FOR FINAL APPROVALS OF THE PROJECT.