Saturday, July 16, 2016

Testing of Trip Coil Supervision Relay (94)

.     Pick-Up and Drop-Off voltage to be checked for all TCS  relay.
                                    .     Before testing technical data of devices to be checked.
                                    .     Testing to be performed by voltage injection on coil terminals.
                                    .     Function check by simulation with nominal voltage of trip circuits.
                                    .     Connect DC Variable voltage to tripping relay coil and increase                                                      voltage until relay trips. Note this voltage.
                                    .      Switch OFF the voltage.
                                    .      Connect the NO contact of the Tripping relay to stop the timer.
                                    .      Again apply the voltage and note the time of operation

No comments:

Post a Comment